Skip to main content
en
  • English
  • French
  • Deutsch
  • Japanese
  • Korean
  • Polish
  • Turkish
Partners
  • Partner Ecosystem
  • Become a Partner
  • Find a Partner

User account menu

  • Investors
  • Log in

Search

Search our website

Use keywords to search the Planisware website...

Home
  • Products & Solutions
    • Products

      Planisware-Orchestra-Symbol
      Planisware Orchestra
      Turnkey PPM Solution for PMOs
      Planisware Luma Icon
      Planisware Luma
      PSA for Project Business
      Planisware Horizon Symbol
      Planisware Horizon
      IT Strategic Portfolio Management
      Planisware-Nova-UP-Symbol
      Planisware Nova
      SPM for Product Development
      Planisware Valoris Logo
      Planisware Valoris
      CAPEX & Asset Investment Planning
      Planisware-Enterprise-Symbol
      Planisware Enterprise
      Business Transformation at Scale
      • See all products
    • Solutions

      • Strategic Portfolio Management (SPM)
      • Essential PMO
      • Project Controls & Engineering
    • Capabilities

      • Strategic Planning
      • Resource Management
      • Product & Roadmapping
      • Work Management
      • Agile & Agility at Scale
      • All Capabilities
    • Platform

      • Artificial Intelligence in PPM
      • Integrations & APIs
      • Platform & Cloud Services
    Featured Solutions
    Image
    Planisware PRISMA EN

    Planisware Prisma: Vision meets execution, in a single conversation

    Read the article
    Image
    Alternatives to MSP

    What is the best alternative to replace Microsoft Project?

    Read the article
  • Customers
    • Customer Success

      • Customer Stories
      • Training & Certification
    • Customer Support

      • Customer Portal
      • Community Forum
      • Public Notices
    • Industries

      • Aerospace & Defense
      • Automotive
      • Banking & Financial Services
      • Consumer Packaged Goods
      • Government and Public Sector
      • Medical Technology
      • Pharma
    Featured Stories
    Image
    Primark Customer Story Thumbnail

    How Primark strengthened portfolio visibility and governance with Planisware

    Read the article
    Image
    2,000 Projects. Zero Paper. Billions Saved: How ADNOC Built a Group-Wide Source of Truth with Planisware

    2,000 Projects. Zero Paper. Billions Saved: How ADNOC Built a Group-Wide Source of Truth with Planisware

    Read the article
  • Resources
    • Discover

      • Upcoming Events
      • Planisware Hub
      • On-demand Webinars
      • Streamline Newsletter
      • Demo Library
      • ROI Calculator
    • Learn

      • Product Brochures
      • Product Demos
      • eBooks & Guides
      • Analysts Reports
      • All Resources
    Featured Content
    Image
    AI Reality Check Media

    AI Reality Check for PPM

    Read the article
    Image
    Buyer Guide Project Management

    How to Choose the Perfect Project and Portfolio Management Tool in 5 Steps

    Read the article
  • Company
    • About Planisware

      • Overview
      • Governance
      • Investors
      • ESG & Compliance
      • Careers
    • Information

      • Newsroom
      • Location & Contact
      • Privacy Policy
      • Analyst Recognition
    Featured News
    Image
    Planisware Corporate HQ in Paris

    Planisware accelerates its development in Asia and announces the opening of an office in Seoul

    Read the article
    Image
    Planisware Corporate news

    Planisware unveils AI-powered innovations and latest product improvement at annual conference: Exchange25 EMEA

    Read the article
Get in touch
Log in

Breadcrumb

  1. Planisware solutions

Project Controls & Engineering

Make the decisions that keep your capital projects on track.
Planisware Elevate is a capital project governance, controls and delivery solution for asset owners, built on the Planisware Unified Platform. It connects project definition, sanction readiness, integrated controls, contractor accountability and operational readiness in one governed environment from project request through handover – all in one AI-powered platform. 

Request a demo
Planisware Elevate_Make the decisions that keep your capital projects on track

Leading organizations have chosen Planisware to manage their capital projects

Image
Hydro Quebec
Image
Siemens Logo
Image
Safran Logo
Image
Project Management Event Copenhagen 2025
Image
Aramco Logo
Image
Airbus Logo
Image
Ariane Group Logo
Image
Alstom Logo
Image
Battelle Logo
Image
Doral Renewables logo
Image
Engie Logo
Image
EDF Logo
Image
Eiffage logo
Image
Enedis logo
Image
Michigan DOT
Image
Total Energies logo
Image
ADNOC logo

The future of Engineering & Construction is being decided now

Capital projects lose predictability when critical decisions are delayed, made with incomplete evidence or left unresolved.

Most systems help administer projects or report performance. Planisware Elevate helps owners govern the decisions that shape capital project outcomes.

Cost, schedule, risk, engineering, contracts and contractor progress often sit across different systems and reporting structures. This fragmentation makes it harder to assess whether a project is ready to advance, understand the full impact of change and maintain confidence in the forecast. Planisware Elevate combines proven capital-project practices, connected data and decision intelligence in one controlled project model.

Build realistic timelines, connect scope, resources and costs, and integrate the schedules your teams already use.
Control capital project cost, schedule and performance

Planisware Elevate structures how decisions are made across the lifecycle. From project development governance and sanction readiness to execution assurance and handover, Planisware Elevate connects project maturity, readiness evidence, integrated baselines, contractor performance and delivery outcomes.

Identify exposure earlier. Govern change consistently. Turn project evidence into timely, defensible decisions.

Planisware Elevate – Define the right projects. Build credible plans. Maintain control. Align execution. Deliver operationally ready assets.

E&C Capital Projects Delivery

One integrated solution connecting Portfolio Governance, Project Development, Controls, and Delivery

Portfolio governance target icon

Portfolio Governance & Readiness

  • Project development & Sanction readiness
  • Program Management
  • Front-End Planning
  • Phase-Gate Management
  • Risk & Compliance
Project planning and controls checklist icon

Project Planning & Controls

  • Project Scope & Deliverables
  • Planning & Scheduling
  • Resource Management
  • Cost Control
  • Performance Management
Project delivery execution site icon

Project Delivery Execution

  • Work Package Management
  • Contract Management
  • Documents & Correspondence
  • Field Execution
  • Quality Management
Open collaboration and integration icon

Open Collaboration & Integration Layer

  • CDE
  • BIM
  • PLM
  • ERP

Planisware provides an open collaboration and integration layer to connect owners, EPCs, contractors, subcontractors, suppliers and external stakeholders on a single collaborative platform with standardized workflows across the entire project ecosystem.

Spotlight on integration         

The key challenges of delivering successful capital projects

Large capital projects require organizations to make critical funding, phase-gate, and execution decisions long before all uncertainties are resolved. Yet project readiness, costs, risks, engineering progress, and delivery performance are often fragmented across teams and systems, making it difficult to see the full picture.

Projects Are Approved Before They Are Ready

The challenge: Critical investment decisions are often made with incomplete scope definitions, insufficient engineering maturity, unresolved risks, and limited evidence that a project can be delivered successfully. Organizations lack a consistent way to assess project readiness before committing capital. 

Business impact:

  • Unrealistic budgets and schedules
  • Predictable overruns discovered too late
  • Rework, replanning, and scope instability
  • Reduced confidence in investment decisions



Key question: "Are we truly ready to move this project forward?"

 

Decisions Are Made Without a Complete View

The challenge Cost, schedule, risk, engineering, contracts, field execution, and financial performance are managed across disconnected systems and spreadsheets. Decision-makers spend more time reconciling information than understanding what it means. 

Business impact:

  • Multiple versions of the truth
  • Conflicting forecasts
  • Slow decision-making
  • Limited visibility into impacts and trade-offs
  • Difficult-to-defend governance decisions


Key question: "Do we have enough evidence to make the right decision?"

 

Change Outpaces Governance

The challenge: Capital projects operate in a constantly changing environment. Scope evolves, risks materialize, engineering changes emerge, contractors face delays, and market conditions shift. Most organizations can detect change, but they struggle to understand its impact quickly enough to respond effectively. 

Business impact:

  • Loss of control over scope, cost, and schedule
  • Delayed approvals and slow responses
  • Inaccurate forecasts
  • Claims, disputes, and delivery uncertainty
  • Erosion of stakeholder confidence


Key question: "Can we respond quickly and consistently when reality changes?"

Built to eliminate the friction slowing down 
your Capital Projects

Almost everything an asset owner knows about a project originates elsewhere: engineering maturity, contractor schedules, field progress, cost actuals and change requests. Planisware Elevate provides one model of the project, consolidating contractor information, controls and readiness criteria rather than relying on external reporting.

PC&E Pains 1
PC&E Pains 2
PC&E Pains 3

Built for how capital projects actually work

Five interconnected capabilities across the capital project lifecycle

Define and mature candidate capital projects

Planisware Elevate structures front-end planning to reduce ambiguity, strengthen project definition, and support defensible funding decisions before execution begins.

  • Project development: request intake, candidate project development, and scenario analysis
  • Project readiness: scope definition, OKR criteria, and design maturity tracking (Class 5 → Class 1)
  • Governance: gate reviews and structured phase-gate processes, FEL and PDRI scoring. 
Image
Structure your capital project front-end planning and readiness with phase-gate and FEL governance

Establish a credible integrated baseline

Planisware Elevate connects scope, maturity, work breakdown, sequencing, cost, schedule, and risk into a credible baseline for execution, forecasting, and performance measurement.

  • Integrated scope, cost, schedule, and risk planning
  • WBS/PBS, engineering and construction sequencing, and Advanced Work Packaging (EWP, CWP, PWP, IWP)
  • Quantitative and qualitative risk analysis, Monte Carlo simulations, probabilistic forecasting, and scenario simulations
Image
Build and advanced WBS and link it to requirements and deliverables to tie every item into a controlled baseline.

Control cost, schedule, risk and change

Planisware Elevate connects progress, change, cost, schedule, and risk management so teams can detect deviations early, understand impact, and take corrective action.

  • Integrated risk management across cost, schedule, execution, portfolio exposure, and systemic risk detection
  • Variations, change order management, structured impact analysis, approval workflows, and TCM alignment
  • Continuous reforecasting, cash-flow tracking, EVM, field reporting, productivity tracking, and predictive risk identification
Image
Control capital project cost, schedule, risks and performance

Deliver Work Packages with Confidence

Planisware Elevate structures coordination around deliverables, work packages, workflows, approvals, and shared execution decisions across contractors, disciplines, and delivery teams.

  • Alignment between engineering deliverables, field execution, and Advanced Work Packaging (EWP, CWP, PWP, IWP)
  • Consolidated progress, productivity, and work-package performance monitoring
  • Cross-team coordination, project workflows, approvals, quality, compliance, shared decision context, and full traceability
Image
Advanced Work Package Management turns engineering into executable work — packaged, constraint-free and tracked to sequencing

Prepare for commissioning, handover and operation

Planisware Elevate structures commissioning, inspections, documentation, system readiness, acceptance, and turnover for a controlled transition to operational readiness.

  • Commissioning planning, sequencing, system readiness, and work-package readiness tracking
  • Inspections, testing, quality, compliance, completion documentation, final acceptance, and certification
  • Structured asset turnover, traceability of actions, approvals, readiness decisions, and shared stakeholder visibility
Image
Structure documentation, quality, and compliance, from commissioning to handover and operation
Image
Structure your capital project front-end planning and readiness with phase-gate and FEL governance
Image
Build and advanced WBS and link it to requirements and deliverables to tie every item into a controlled baseline.
Image
Control capital project cost, schedule, risks and performance
Image
Advanced Work Package Management turns engineering into executable work — packaged, constraint-free and tracked to sequencing
Image
Structure documentation, quality, and compliance, from commissioning to handover and operation

Built for Capital projects across industries where decisions cannot be delayed

Image
Megaprojects & Large Scale Capital Programs –  Control complexity at the highest scale

Megaprojects & Large Scale Capital Programs – Control complexity at the highest scale

Megaprojects involve billions in CAPEX, multi-year timelines, and thousands of stakeholders across engineering, procurement, and construction.

These environments require rigorous front-end planning, integrated risk management, and absolute alignment between investment decisions and execution reality.

Planisware Elevate provides the governance, visibility, and decision intelligence needed to manage dependencies, anticipate risks, and ensure that every critical decision is structured, traceable, and defensible – from initial investment to final handover.

Image
Industrial & EPC Projects –  Deliver complex engineering projects with confidence

Industrial & EPC Projects – Deliver complex engineering projects with confidence

Industrial and EPC projects demand tight coordination between engineering maturity, procurement, contractors, and field execution – often under extreme cost and schedule pressure.

Planisware Elevate connects design, planning, and construction through structured work packaging, integrated cost control, and real-time execution visibility – ensuring that projects are not just planned, but fully executable.

Image
Infrastructure & Transportation Projects – Align multiple stakeholders in complex delivery environments

Infrastructure & Transportation Projects – Align multiple stakeholders in complex delivery environments

Infrastructure projects combine public and private stakeholders, regulatory constraints, and long delivery cycles with multiple contractors and interfaces.

Planisware Elevate structures coordination across all parties – aligning workflows, contracts, and schedules – and provides a shared decision framework that ensures transparency, governance, and predictable delivery at scale.

Image
tilities Programs – Manage large portfolios of distributed investments

Utilities Programs – Structure project development and governance across capital programs

Utilities and network operators oversee hundreds of concurrent capital projects across geographies, assets, and delivery teams. Ensuring projects are well-defined, aligned with business requirements, and ready for sanction before execution begins is critical to improving outcomes at scale.

Planisware Elevate helps establish a consistent framework for Project Definition and Sanction Readiness, providing visibility into project maturity, governance milestones, risks, and readiness criteria. Through an Owner's Control Model, organizations can standardize project development, strengthen decision governance, and maintain oversight from concept through execution readiness across large capital programs.

Image
Industrial Facilities – Balance growth, investment, and operational constraints

Industrial Facilities – Deliver capital projects with greater definition, control, and operational alignment

Industrial facility owners must develop and deliver modernization, expansion, and brownfield projects while maintaining safe and reliable operations. Managing evolving requirements, project complexity, and stakeholder alignment is critical to reducing execution risk before work begins.

Planisware Elevate helps asset owners strengthen Project Definition and Sanction Readiness by providing structured governance, scope maturity assessment, and integrated change control throughout project development. Through an Owner's Control Model, organizations can maintain visibility over project readiness, risks, and key decision gates while aligning engineering, planning, and execution teams to improve project outcomes without disrupting ongoing operations.

Built for every decision-maker in capital projects

From early investment decisions to final handover, Elevate supports each role with the tools, insights, and control they need to act with confidence.
Fund the right projects and steer strategic outcomes

Capital Project & Portfolio Leaders

Fund the right projects and steer strategic outcomes. Prioritize investments, evaluate scenarios, optimize capital allocation, and maintain visibility into value, risk, funding, and portfolio performance.

Turn strategy into coordinated delivery

PMO & Program Managers

Turn strategy into coordinated delivery. Standardize governance, align roadmaps, dependencies, and resources, and ensure projects and programs remain aligned with business objectives from planning through execution.

Maintain control of cost, schedule, risk, and financial performance

Project Controls & Finance Teams

Maintain control of cost, schedule, risk, and financial performance. Connect planning, forecasting, cost control, cash flow, and quantitative risk analysis to anticipate deviations early, evaluate scenarios, and support better project decisions.

Translate plans into executable work

Operations & Work Package Managers

Translate plans into executable work. Manage Engineering, Procurement, Construction, and Commissioning Work Packages while connecting engineering readiness, constraints, field progress, productivity, quality, and safety to deliver reliable execution.

Deliver assets ready for operations

Commissioning & Delivery Partners

Deliver assets ready for operations. Coordinate correspondence, approvals, testing, compliance, system readiness, and structured handover processes with full traceability across stakeholders.

Planisware’s Long-standing Recognition by Gartner, Forrester, and Industry Analysts

Sustained Leadership, Trusted Recognition

Image
Planisware - Gartner's APMR Magic Quadrant Leader for five consecutive years
Image
Gartner Peer Insights Customers' Choice 900x900
Image
3x Leader in Forrester SPM Wave
Image
IDC 2x Leader Marketscape for SPM and IT PPM
Image
Info-Tech 3x Champion PPM Emotional Footprint 900x900
Image
Gigaom Radar Leader for Agile and PPM 900x900

Planisware AI - ElevateAI Embedded across the capital project lifecycle

Planisware Elevate integrates AI directly into the workflows that drive capital project performance – not as a standalone tool, but as a layer embedded across planning, control, and execution.

AI Assistants & Automation

Image
AI assistants and automation

Simplify how teams interact with complex project data

  • Automatically read and structure project documents and requests
  • Generate summaries, explanations, and decision narratives
  • Support users with contextual insights and guided workflows
  • Accelerate onboarding and adoption across teams


From manual effort → augmented decision-making at scale

Decision Intelligence

Image
Decision intelligence

Turn data into clear, explainable decisions

  • Detect misalignment, cost anomalies, and emerging risks
  • Identify projects that are not ready for investment (maturity, risk, capacity)
  • Surface portfolio drift, contractor overload, and financial exposure
  • Provide explainable recommendations with full traceability


From fragmented signals → clear decisions you can defend

Predictive & Scenario Intelligence

Image
Predictive scenario intelligence

Understand outcomes before they happen

  • Run scenario simulations across cost, schedule, and risk
  • Generate rolling forecasts based on real project data
  • Provide probabilistic views (P50 / P80 / P90)
  • Anticipate delays, overruns, and execution bottlenecks


From reactive reporting → forward-looking control

Execution Intelligence

Image
Execution intelligence

Connect decisions to real-world project execution

  • Detect inconsistencies in estimates, schedules, and cost structures
  • Identify root causes of delays, variations, and productivity issues
  • Monitor execution performance in real time (field, work packages, contractors)
  • Enforce workflows and trigger actions based on thresholds


From insight → action across the project lifecycle

Check out our featured success stories 

CS Doral Web Th.png
Article

How Doral Renewables Scaled Solar Development Across 50+ Projects and 22 States

Read more
TotalEnergies Journey to Make Portfolio Management Strategic
Article

TotalEnergies Journey to Make Portfolio Management Strategic

Read more
2,000 Projects. Zero Paper. Billions Saved: How ADNOC Built a Group-Wide Source of Truth with Planisware
Video

2,000 Projects. Zero Paper. Billions Saved: How ADNOC Built a Group-Wide Source of Truth with Planisware

Read more

Discover more customer stories

Smarter engineering solutions start here

Image
PC&E Diagram

Want the full picture?

Join ACME's portfolio and project management teams as they continuously adapt their hydrogen program to respect delays and budgets, despite unexpected events (i.e. new mandatory/defective component, recent contractors discussions, design reviews).
Start the mini-series

Explore

Explore resources designed to support better project controls and engineering outcomes
Explore resources

Educate

Discover how Planisware helps PC&E teams streamline project delivery and cost control
Download the brochure

Experience

Request a demo to discover how Planisware supports smarter project execution
Request a demo

Frequently Asked Questions

What resources can I consult for more information about capital project management and project controls?

These Planisware resources provide a practical learning path from capital project fundamentals and governance to integrated controls, earned value, cost forecasting, and enterprise integration.

  • Capital Project Planning Platform: Why Planisware Leads Project Controls and Engineering: Explains why large capital programs need integrated scope, cost, schedule, and risk rather than disconnected reporting tools.
  • Choosing a Project Controls Platform for EVM and Cost Control: Provides selection criteria for baselines, actual-cost feeds, earned value, variance analysis, and audit-ready change control.
  • Best PPM Tools for Earned Value and Financial Analytics: Clarifies how EVM, forecasting, and financial analytics support earlier intervention and more reliable estimates at completion.
  • Project Cost Management: Real-Time Portfolio Scheduling: Examines how leaders can connect budgets, forecasts, schedules, and actuals without manual consolidation.
  • Governance and Compliance Tools for Portfolio Managers: Explores decision rights, phase gates, role-based workflows, audit trails, and continuous assurance.
  • How Enterprise PMOs Achieve Centralized Project Oversight: Describes the operating model and data foundation required for consistent oversight across projects and programs.
  • Seamless Integration with Critical Enterprise Applications: Covers connector and API options used to combine ERP, scheduling, analytics, and other enterprise data.

Next step: Start with the capital project planning guide, then use the project controls and integration resources to build an executive evaluation checklist.

What is capital project management software, and when does an organization need it?

Capital project management software coordinates governance and delivery for high-value, engineering-intensive projects from project definition and sanction readiness through execution, commissioning, and handover. It becomes necessary when fragmented data prevents leaders from protecting the approved baseline and forecasting outcomes with confidence.

  • Scale and complexity: Multiple projects, contractors, work packages, interfaces, and decision authorities must be governed consistently.
  • Control requirements: Scope, schedule, cost, risk, change, commitments, and progress need to be assessed as connected variables.
  • Assurance requirements: Gate evidence, approvals, baseline revisions, and handover decisions must remain traceable.

 

The distinction is material. A Planisware article citing a McKinsey review of more than 300 billion-dollar megaprojects reports average cost overruns of approximately 80% and schedule delays of about 50%. These figures illustrate why task tracking alone is insufficient for capital delivery.

Planisware Elevate applies this discipline in a connected project model covering maturity, integrated baselines, contractor performance, change, and delivery outcomes. For a deeper definition, consult the capital project planning platform guide and the Planisware Resource Center.

Next step: Map the decisions currently delayed by reconciliation, unclear ownership, or incomplete evidence.

How should executives compare integrated project controls software with scheduling, ERP, and CDE tools?

Executives should compare these systems by the management question each one answers, not by overlapping feature lists. Integrated project controls software connects delivery performance and governance; scheduling, ERP, and CDE tools remain authoritative in their specialist domains.

SystemPrimary management purposeExecutive evaluation question
SchedulingActivity logic, milestones, critical path, and detailed plansCan schedule changes be assessed with cost, risk, and progress impacts?
ERPFinancial transactions, actuals, commitments, and accounting controlDo financial actuals flow reliably into current forecasts?
CDEControlled project information, models, drawings, and documentsCan delivery decisions reference current, governed information?
Project controls platformBaseline, forecast, risk, change, EVM, and program oversightCan leaders see consequences across disciplines before approving action?

Integration is therefore a core selection criterion. Planisware reports that 80%+ of its deployments include at least one integration. Planisware Elevate can serve as the governed controls and decision layer while existing systems continue to perform their operational roles.

See the enterprise integration overview and the project controls platform selection guide.

Next step: Evaluate data ownership, update cadence, reconciliation effort, and decision latency before discussing replacement.

Which metrics show that capital project predictability is improving?

Capital project predictability improves when leading indicators become more stable and forecasts become more accurate, not simply when teams produce more reports. A balanced executive scorecard should connect baseline performance, forecast confidence, risk exposure, change, and execution readiness.

CategoryMetricsPurpose
Cost and scheduleCPI, SPI, variance at completion, milestone trendShows whether delivery efficiency and timing are drifting from the approved baseline.
ForecastEAC stability, ETC movement, forecast accuracy, P50/P80 confidenceTests whether expected outcomes are becoming more reliable.
Change and riskPending change exposure, approval cycle time, contingency drawdown, risk movementReveals whether emerging exposure is understood and governed promptly.
ReadinessGate criteria complete, constraints cleared, work packages ready, punch items outstandingConfirms that work and handover decisions are supported by evidence.

 

EVM provides three foundational data points: planned value, earned value, and actual cost. At enterprise scale, one published Planisware example describes an ADNOC rollout from 10 projects to more than 2,000 in 9 months, supported by digital approvals and a shared source of truth.

Explore earned value and financial analytics, real-time cost and scheduling, and the ADNOC customer case study.

Next step: Select a small set of leading and lagging indicators tied to explicit decision thresholds and owners.

How can asset owners govern multiple EPCs and contractors without slowing delivery?

Asset owners can govern multiple EPCs and contractors effectively by standardizing the evidence, interfaces, and decision rights required for oversight while allowing each delivery partner to retain appropriate execution methods. The objective is consistent assurance, not centralized micromanagement.

  1. Define common data standards. Align coding structures, reporting periods, progress rules, and forecast definitions.

  2. Clarify decision rights. Set approval thresholds, delegated authority, escalation paths, and required gate evidence.

  3. Connect interfaces. Link owner, EPC, scheduling, financial, and document data without duplicating system ownership.

  4. Govern change consistently. Assess cost, schedule, risk, and contractual effects before baseline revisions are approved.

  5. Measure readiness and outcomes. Track work-package constraints, milestones, forecast movement, commissioning evidence, and open actions.

Planisware internal E&C research notes that 94% of respondent firms did not deliver every project on time and/or on budget; among projects that slipped, 64% were at least one month late and 76% exceeded budget by at least 6%. A governed data model helps leaders distinguish isolated contractor issues from systemic program exposure.

Planisware Elevate supports standardized workflows, permissions, reporting, progress oversight, and traceability. Related guidance includes governance and compliance tools, centralized project oversight, and the E&C capital projects page.

Next step: Start with a contractor data and decision-rights charter for one flagship project.

What capabilities help reduce capital project cost and schedule overruns?

Reducing capital project overruns requires earlier detection and faster governance of the conditions that create them. The strongest controls connect baseline integrity, forecast movement, risk, change, and execution readiness so leaders can intervene while options remain available.

  • Integrated baselines: Align scope, WBS, schedule, CBS, risk, and work-package logic.

  • Forward-looking forecasts: Combine actuals, commitments, ETC, schedule trends, and quantified uncertainty.

  • Formal change control: Require impact analysis, authority-based approval, version history, and baseline traceability.

  • Earned value management: Compare planned value, earned value, and actual cost to expose performance variance early.

  • Readiness controls: Prevent immature scope or constrained work from advancing without evidence.

The Planisware capital project planning guide cites more than 300 megaprojects with average overruns of approximately 80% and delays of about 50%. The implication is not that software removes uncertainty, but that connected controls make uncertainty and its consequences visible sooner.

Planisware Elevate brings cost, schedule, risk, change, progress, and forecasting into one governed model. Review capital project planning and controls, EVM and cost-control platform criteria, and project cost management and scheduling.

Next step: Identify the three variances that currently become visible too late and redesign the data-to-decision workflow around them.

How can an organization implement integrated project controls without replacing its existing systems?

An organization can implement integrated project controls incrementally by defining system ownership, connecting priority data flows, and proving governance on representative projects before scaling. A rip-and-replace program is rarely the only path.

  1. Define the target decisions. Prioritize the executive and controls decisions that need faster, more reliable evidence.
  2. Map authoritative sources. Confirm where schedules, actuals, commitments, documents, risks, and progress are maintained.
  3. Standardize structures. Agree WBS/CBS mappings, calendars, status dates, progress rules, and change classifications.
  4. Integrate a minimum viable flow. Connect the data required for baseline, forecast, EVM, risk, and change oversight.
  5. Pilot and scale. Validate calculations, approvals, audit trails, reporting cadence, and responsibilities before extending across programs.

Planisware states that 80%+ of deployments include at least one integration. Its AI maturity research also draws on 243 organizations, reinforcing that governance, skills, and trust are as important as technology when scaling new decision capabilities.

Planisware Elevate can coexist with scheduling, ERP, CDE, BIM, and analytics environments through connectors and APIs. Review the integration options, the AI Reality Check for PPM, and the capital project planning platform guide.

Next step: Run a proof of concept using real baseline, actual-cost, and change data from one representative project.

Does Planisware Elevate replace Primavera P6, ERP systems, or a Common Data Environment (CDE)?

Planisware Elevate is designed to work with the systems organizations already use, complementing them, based on organization-specific needs. 

Planisware integrates Primavera P6 and MS Project, ERP and finance (including SAP S/4HANA), BIM, CDE, field and reality-capture tools, and Power BI – through native connectors and a REST API framework. It acts as the project governance and decision layer that connects these systems into one unified portfolio capital project governance, planning, controls, and execution environment with standardized workflows across the entire project ecosystem.

Footer Streamline

The Streamline newsletter: every other month the best articles about project and agility in your inbox.
And nothing else!

Academics, magazines, blogs or published authors. We filter the hype and eliminate the noise: Streamline delivers the latest actionable insights from the project world.
Subscribe now to Streamline
© 2026 Planisware

Footer menu

  • Privacy policy
  • Trademark & copyright
  • Glossary
  • Careers
  • Customer portal